0: Preface
1: Formulating the Mess
2: Ends Planning
3: Means Planning
4: Resource Planning
5: Design of Implementation
6: Design of Controls
7: Epilog
8: Appendix
9: Fundamentals
10: Loose Sections
11: Todo List
Skip to content

2.3.8 LUMPS: The Micro Scale ​

Little Untransformed Meaningful Problematic Situations

Scope: The Micro Level (Individual / Team / Code)
Strategic Owner: Frontline Managers, Contributors.

LUMPS are the details, the daily pressures, and the highly localized problems within each sub-domain of a BUMP. They are functionally divided logically by the dimensions of the problem space, meaning they exhibit limited complexity and are generally within the capability of a single human's intuition to transform.

While small individually, a critical mass of LUMPS will act like quicksand, preventing an organization from ever allocating the cognitive bandwidth required to address their larger, systemic BUMPS.

This work is licensed under a CC BY-NC-ND 4.0 International License.